Automation built
for manufacturers.
Connect production, inventory, vendors, and quality into one live system — across one plant or many.
AI · Line D stopped 38 min ago — root cause flagged as raw material shortage. Cotton Yarn 30s reorder PO drafted. Line B lagging: AI predicted 12% yield drop based on batch variance.
Real outcome from a ₹40 Cr manufacturer
If any of these sound familiar,
you're not alone.
Production schedules live in one person's head — and when they're out, everything stalls.
Raw-material stock never matches the system. You find out there's a shortage when the line stops.
Vendors slip on delivery and nobody knows until the damage is done.
Quality is still logged on paper, and tracing a defect batch takes days.
If you run more than one plant, you're flying blind on at least one of them.
Daily MIS takes 2+ hours to compile and is already out of date by the time it's read.
Production, inventory, and finance
finally speak to each other.
BOM tracking & work-order automation
Bill of Materials tied live to production orders. Work orders raised, tracked, and closed automatically — so production planning isn't one person's spreadsheet.
Vendor scoring & delivery tracking
Every vendor's on-time rate, quality score, and price history in one view. Automatic alerts when a delivery is late, before the line feels it.
AI yield prediction & quality logs
Our AI spots batch variance patterns before they become defects — and digital quality logs replace paper, so tracing a batch takes minutes, not days.
Multi-plant command center
Every facility on one screen — output, OEE, downtime, and inventory. Whether you have one plant or five, you see everything from your phone.
What your Manufacturing AI will tell you
Proactive intelligence in plain language — not buried in reports.
“Cotton Yarn 30s will hit zero in 2.6 days at current consumption. PO auto-drafted for ₹1.8L — awaiting your approval.”
“Batch B-224 shows 12% variance in tensile test. AI predicts 18% yield drop on Line B — flagged for QC review before production continues.”
“Supplier Rathi Metals is 3 days late on delivery for Work Order #WO-881. Line A will halt in 6 hours if not resolved.”
The numbers behind the dashboard
Book a Free Diagnostic
for your plant.
We'll map your production, inventory, and vendor flows — and show you exactly what automation would unlock for your business in a 2-week deep-dive.